The Design Division of Lernametalurgiai Institute cjsc:
• Develops all parts of design estimates based on technological regulations;
Activities
Lernametalurgiayi Institute cjsc has implemented design works for construction and operation of the following units:
• Zangezour copper-molybdenum combine
• Kapan ore enrichment combine
• Agarak copper-molybdenum combine
• Meghradzor mine
• Ararat gold recovery plant
• Sotk mine
• Kanaker aluminum works
• Alaverdi mining-metallurgical combine
• Akhtala mine
• Ijevan bentonite combine
• Аuto repair shop in Kapan
• Auto repair plant in Almalik (Uzbekistan)
• Gay mining-metallurgical plant, Letnee mine (Russia)
• North-Uralian copper smelting plant (SUMZ) (Russia)
• Gay mining and processing plant (Russia)
• Skopin mining-metallurgical plant
• Krasnouralsk copper smelting plant (Russia)
• Storm-protecting constructions for the town Tirniauz (Kabardino-Balkaria) and for Tirniauz tungsten-molybdenum plant
• Tailing-dump of Sadon lead-zinc plant on the river Ardon (Northern Hosea)
• Tailing-dump for Solnechniy mining and processing plant (the Far East)
• Storm-protecting constructions for Tajikistan gold plant
• Apartment houses, pioneer camps, medical institutions, sports buildings and constructions, different civic constructions for plants and enterprises.